# How Nuclear Plants Stay Cool

> On 8 November 2026 the International Atomic Energy Agency reported that the Zaporizhzhia nuclear power plant in Ukraine, Europe’s largest, had lost its last off-site power line, the 27th such loss during the war, and was running its cooling on emergency diesel generators until the line was restored. This film explains the established engineering behind that news: why a reactor keeps making heat after it is shut down, how fast that decay heat falls, the difference between hot and cold shutdown, why pumps need off-site power, how emergency diesel generators, batteries and redundant safety trains take over, what a station blackout is, the idea of defence in depth, how the Fukushima Daiichi accident of 2011 unfolded when a tsunami drowned the generators, the portable-equipment rules that followed, why spent fuel pools need cooling too, and how passive designs such as the AP1000 can cool a reactor with gravity and air.

Interactive film: https://www.planetpast.com/stories/how-nuclear-plants-stay-cool/  
Publisher: PlanetPast (https://www.planetpast.com/) · d => T('readPublished', l, { d: dateIn(d, l) }) 2026-11-11 · Physics, Technology

## Prologue

### Switched off, still hot
*Physics · Technology*

Why a shut-down reactor still needs power.

On the eighth of November 2026, all six reactors at Zaporizhzhia in Ukraine were switched off. Yet emergency diesel generators had to start to keep them cool. That morning the plant had lost its last line to the grid: the twenty-seventh such loss in the war, according to the IAEA. The diesels ran the cooling until the IAEA confirmed, later that day, that the line was back. So why does a switched-off reactor still need power at all? The answer is one stubborn kind of heat, and the chain of machines built to carry it away.

![Almost every nuclear plant keeps diesels on standby for exactly this moment. AI-generated illustration.](https://assets.planetpast.com/a/80/808ddec431d30203.jpg)

- **27th**: loss of all off-site power since the war began
- **26th**: was on 20 August 2026, and lasted until early September

![The line that dropped out was Ferosplavna-1, a 330-kilovolt line and the plant’s only remaining link, according to the IAEA. AI-generated illustration.](https://assets.planetpast.com/a/cc/ccd2c28f86044bc1.jpg)

- fuel that keeps making heat
- water that carries the heat away
- pumps that move the water
- electricity that runs the pumps

Prologue

#### The news

Anadolu Agency (8 November 2026), citing the IAEA: the Zaporizhzhya plant lost its connection to Ferosplavna-1, its only remaining external line, early on Sunday 8 November, the 27th loss of all external power since the conflict began; it ran on emergency diesel generators for reactor cooling and other safety functions. The Kyiv Independent: the IAEA announced the outage around noon and confirmed about ten hours later that power had been restored; Director General Rafael Grossi said it was “the 27th such event during the conflict”. The 26th began on 20 August 2026 and ended when the line was repaired in early September (ANS Nuclear Newswire).

The IAEA (Update 263, December 2024) said the plant had not produced electricity for more than two years and that its six units, all in cold shutdown, still need off-site power for cooling. In the 3D scene, the plant is a simplified model, not a map of the real site.

Sources: [Anadolu Agency (8 Nov 2026): Ukraine’s Zaporizhzhya nuclear plant loses all external power for 27th time, UN nuclear watchdog says](https://www.aa.com.tr/en/world/ukraines-zaporizhzhya-nuclear-plant-loses-all-external-power-for-27th-time-un-nuclear-watchdog/4115903); [The Kyiv Independent (8 Nov 2026): Power to Zaporizhzhia nuclear power plant cut, restored, IAEA says](https://kyivindependent.com/power-to-zaporizhzhia-nuclear-power-plant-cut-restored-iaea-says/); [American Nuclear Society, Nuclear Newswire (9 Sep 2026): Zaporizhzhia restores off-site power following IAEA-brokered local ceasefire (26th loss, 20 August 2026)](https://www.ans.org/news/2026-09-09/article-8377/zaporizhzhia-restores-offsite-power-following-iaeabrokered-local-ceasefire/); [IAEA, Update 263: Director General statement on the situation in Ukraine (Dec 2024): six units in cold shutdown, no electricity produced for more than two years](https://www.iaea.org/node/195686); [IAEA, Update 298: Director General statement on the situation in Ukraine (June 2025): ten off-site lines before the conflict; six units in cold shutdown since 2024](https://www.iaea.org/node/222642); [Wikipedia: VVER (VVER-1000/V-320: 3,000 MW thermal, 1,000 MW electric, four loops; Zaporizhzhia units 1–6)](https://en.wikipedia.org/wiki/VVER)

## Chapter I · The heat that stays

### 

When a reactor shuts down, control rods drop into the core and soak up the neutrons that keep atoms splitting, and the chain reaction stops. But the fuel is now full of the fragments of the split atoms. Many of these fragments are radioactive. As they decay they give off radiation, and that radiation turns into heat inside the fuel. This is decay heat. No control rod can switch it off, because it does not depend on the chain reaction at all.

![An illustration of a reactor vessel lid, where the control-rod drives sit. AI-generated illustration.](https://assets.planetpast.com/a/4c/4c1b7a46d737f2a7.jpg)

![Uranium oxide pellets sit inside metal cladding tubes: together, the first barrier that holds the radioactive fragments. AI-generated illustration.](https://assets.planetpast.com/a/c6/c67d68df94cba408.jpg)

- running: fission, stopped by the control rods
- after shutdown: radioactive decay of fission products
- the second cannot be stopped, only carried away

![The rods are in and the core is quiet, yet the fuel keeps heating the water around it. AI-generated illustration.](https://assets.planetpast.com/a/94/940634a2fe9cc76f.jpg)

Chapter I · The heat that stays

#### Why the heat stays

US DOE Fundamentals Handbook (Heat Transfer): after shutdown, the fission products left in the fuel keep decaying and releasing energy, so heat continues to be produced long after the chain reaction has stopped; this decay heat must be removed or the fuel overheats.

The chain reaction itself is explained in our film How Nuclear Fission Works. Press Running and Shut down in the scene.

The 3D scenes are simplified teaching models, not to scale.

Sources: [US DOE Fundamentals Handbook, Heat Transfer (HT-02): Decay heat, about 7% of pre-shutdown power, about 2% within the first hour, 1% within the first day](https://nuclearpowertraining.tpub.com/h1012v2/css/Decay-Heat-74.htm); [Wikipedia: Decay heat (6.5% at shutdown, 1.5% after an hour, 0.4% after a day, 0.2% after a week; spent fuel about 10 kW per tonne after a year)](https://ipfs.ssi.eecc.de/ipns/en.wikipedia-on-ipfs.org/wiki/Decay_heat)

### 

How much heat? At the moment of shutdown, decay heat is about six and a half percent of the reactor's full power. It falls fast at first: to about one and a half percent after an hour, and to less than half a percent after a day. Then it falls slowly. After a week it is still about 0.2 percent, and a year after it leaves the reactor, spent fuel still gives off about ten kilowatts per tonne. Press the buttons to follow the curve.

![Under water, fast particles from the decaying fuel make a blue light called Cherenkov radiation. AI-generated illustration.](https://assets.planetpast.com/a/40/40c6519b2f4e5c9b.jpg)

- at shutdown: ~6.5%
- 1 hour: ~1.5%
- 1 day: ~0.4%
- 1 week: ~0.2%

- **~10 kW**: after one year: about four 2.5 kW kettles left on (our comparison)
- **~1 kW**: after ten years

Chapter I · The heat that stays

#### The decay-heat curve

Wikipedia (Decay heat), for a reactor that has run for a long time: about 6.5% of the previous core power at shutdown, about 1.5% after an hour, 0.4% after a day and 0.2% after a week; spent fuel produces about 10 kW per tonne after a year and about 1 kW per tonne after ten years. The US DOE handbook gives rounder figures: roughly 7% at shutdown, about 2% within the first hour and 1% within the first day.

The curve in the scene is drawn through those published points on a logarithmic time axis; between them it is a smooth illustration, not a calculation for a particular reactor. Press the time buttons in the scene, or scrub the timeline.

Sources: [Wikipedia: Decay heat (6.5% at shutdown, 1.5% after an hour, 0.4% after a day, 0.2% after a week; spent fuel about 10 kW per tonne after a year)](https://ipfs.ssi.eecc.de/ipns/en.wikipedia-on-ipfs.org/wiki/Decay_heat); [US DOE Fundamentals Handbook, Heat Transfer (HT-02): Decay heat, about 7% of pre-shutdown power, about 2% within the first hour, 1% within the first day](https://nuclearpowertraining.tpub.com/h1012v2/css/Decay-Heat-74.htm)

### 

A VVER-1000, the reactor type at Zaporizhzhia, makes about three thousand megawatts of heat at full power. One and a half percent of that, an hour after shutdown, is forty-five megawatts: enough to boil away about twenty litres of water every second. So cooling is a loop: pumps push water through the core to steam generators, and the heat goes on to a river, a sea or a pond. Stop the water, and the fuel heats up until its metal tubes are damaged.

$$0.015 \times 3000\ \text{MW} \approx 45\ \text{MW}$$
- $3000\ \text{MW}$: heat of a VVER-1000 at full power (1,000 MW of electricity)

$$\frac{45\ \text{MW}}{2.26\ \text{MJ/kg}} \approx 20\ \text{kg/s}$$
- $2.26\ \text{MJ/kg}$: heat needed to turn 1 kg of boiling water into steam

![It passes the heat to a second, separate water loop that makes the steam; a VVER-1000 has four, lying on their sides. AI-generated illustration.](https://assets.planetpast.com/a/f5/f594d99e9a2f0995.jpg)

![The heat ends up in a body of water or in the air: engineers call it the ultimate heat sink. AI-generated illustration.](https://assets.planetpast.com/a/b0/b03f6aaa45af0b11.jpg)

Chapter I · The heat that stays

#### A loop that must keep turning

Wikipedia (VVER): the VVER-1000/V-320, the model at Zaporizhzhia units 1–6, produces about 3,000 MW of heat and 1,000 MW of electricity, with four cooling loops at about 16 MPa (inlet about 289 °C, outlet about 319 °C at power). OECD-NEA: four horizontal steam generators per unit.

Press Stop the pumps and Run the pumps in the scene; the warming shown is illustrative.

The 45 MW and 20 litres a second are our own arithmetic: 1.5% of 3,000 MW, divided by the latent heat of vaporisation of water (about 2.26 MJ per kilogram). In practice the plant removes this heat through the loop rather than by boiling water away; the figure shows the scale. Wikipedia (Fukushima): when cooling failed there, the zirconium cladding of the fuel reacted with steam.

The 3D scenes are simplified teaching models, not to scale.

Sources: [Wikipedia: VVER (VVER-1000/V-320: 3,000 MW thermal, 1,000 MW electric, four loops; Zaporizhzhia units 1–6)](https://en.wikipedia.org/wiki/VVER); [OECD Nuclear Energy Agency, MDEP: VVER-1000 comparison report (Balakovo-4, V-320: three independent safety trains, three emergency diesel generators, 3×100%)](https://cms.oecd-nea.org/mdep/documents/TR06VVER-1000_comparison_report_FINAL.pdf); [Wikipedia: Decay heat (6.5% at shutdown, 1.5% after an hour, 0.4% after a day, 0.2% after a week; spent fuel about 10 kW per tonne after a year)](https://ipfs.ssi.eecc.de/ipns/en.wikipedia-on-ipfs.org/wiki/Decay_heat); [Wikipedia: Fukushima nuclear accident (zirconium cladding oxidised by steam made the hydrogen; unit 4 spent fuel pool)](https://ipfs.ssi.eecc.de/ipns/en.wikipedia-on-ipfs.org/wiki/Fukushima_Daiichi_nuclear_disaster)

## Chapter II · Hot, cold and the grid

### 

There are two kinds of shutdown. In hot shutdown the chain reaction has stopped, but the water is still hot and under pressure. In cold shutdown the water is below about ninety-three degrees Celsius: safely under boiling at normal air pressure, so it no longer has to be held under pressure. All six Zaporizhzhia reactors have been in cold shutdown since April 2024. The IAEA says that gives days of margin if cooling stops, and it needs less cooling water, which has been harder to supply since the Kakhovka dam was destroyed in 2023.

- **hot**: fuel still hot, water pressurised, more cooling water needed
- **<93 °C**: cold: coolant at atmospheric pressure (NRC: below 200 °F)

![At Zaporizhzhia, the IAEA says, groundwater wells on the site now supply the cooling water for essential services. AI-generated illustration.](https://assets.planetpast.com/a/e1/e159e004994509a4.jpg)

- Mar 2022: Russian forces take control of the plant
- Sep 2022: IAEA experts stationed on site
- Jun 2023: Kakhovka dam destroyed
- Apr 2024: all six units in cold shutdown

![Wells drilled on the site have taken over part of the job the reservoir used to do (IAEA). AI-generated illustration.](https://assets.planetpast.com/a/32/329800d069cf51e0.jpg)

Chapter II · Hot, cold and the grid

#### Hot and cold shutdown

US NRC glossary: cold shutdown is a reactor coolant system at atmospheric pressure and at a temperature below 200 °F (about 93 °C), following a reactor cooldown. Wikipedia (Shutdown): in a normal, hot shutdown the fuel remains hot and coolant is still required.

Ukrinform, citing the IAEA (13 April 2024): unit 4 completed the move from hot to cold shutdown that morning, so all six units were in cold shutdown for the first time since late 2022; cold shutdown gives several days to respond if heat removal is interrupted and needs less cooling water, which became harder to supply after the Kakhovka dam was destroyed in mid-2023. IAEA Update 310: groundwater wells on site supply cooling water for essential services. Anadolu Agency: Russia has controlled the plant since March 2022 and IAEA staff have been there since 1 September 2022.

Press Hot and Cold in the scene to compare. The 3D scenes are simplified teaching models, not to scale.

Sources: [US NRC glossary: Cold shutdown (reactor coolant at atmospheric pressure and below 200 °F)](https://www.nrc.gov/reading-rm/basic-ref/glossary/cold-shutdown.html); [Wikipedia: Shutdown (nuclear reactor) (hot and cold shutdown; below 93 °C)](https://en.wikipedia.org/wiki/Shutdown_(nuclear_reactor)); [Ukrinform (13 Apr 2024): All reactors at Zaporizhzhia NPP in cold shutdown for first time since 2022, IAEA says](https://www.ukrinform.net/rubric-economy/3852084-all-reactors-at-zaporizhzhia-npp-in-cold-shutdown-for-first-time-since-2022-iaea.html); [IAEA, Update 310: Director General statement on the situation in Ukraine (2025): cores and spent fuel pools still need cooling water; groundwater wells](https://www.iaea.org/node/230478); [Anadolu Agency (8 Nov 2026): Ukraine’s Zaporizhzhya nuclear plant loses all external power for 27th time, UN nuclear watchdog says](https://www.aa.com.tr/en/world/ukraines-zaporizhzhya-nuclear-plant-loses-all-external-power-for-27th-time-un-nuclear-watchdog/4115903)

### 

Even so, pumps must keep water moving through the cores and the spent fuel pools, where used fuel is kept under water. Pumps need electricity. Normally that power comes from the grid, through several lines. Before the war, Zaporizhzhia had ten off-site lines. In 2025 it was down to a single line, with no backup. When every line fails at once, engineers call it a loss of off-site power, and the plant has to make its own electricity.

- cooling pumps for the six cores
- cooling for the spent fuel pools
- instruments, lighting, ventilation

![Each off-site line ends in a switchyard, where transformers and breakers connect it to the plant. AI-generated illustration.](https://assets.planetpast.com/a/33/335183bd9fa54553.jpg)

- before the war: 10
- June 2025: 1
- 8 Nov 2026, morning: 0

- **LOOP**: loss of off-site power: every power line feeding the safety systems loses the grid at once

Chapter II · Hot, cold and the grid

#### Power from outside

IAEA Update 298 (June 2025): before the conflict the plant had ten off-site power lines; after losing its 330 kV back-up line on 7 May 2025 it depended on a single 750 kV line. IAEA Update 310: it had been connected to a single line for more than three months, the longest period without a backup so far, and its cores and spent fuel pools still need cooling water. Idaho National Laboratory, for the NRC: a loss of off-site power is the simultaneous loss of electrical power to all unit safety buses.

The 3D scenes are simplified teaching models, not to scale.

Sources: [IAEA, Update 298: Director General statement on the situation in Ukraine (June 2025): ten off-site lines before the conflict; six units in cold shutdown since 2024](https://www.iaea.org/node/222642); [IAEA, Update 310: Director General statement on the situation in Ukraine (2025): cores and spent fuel pools still need cooling water; groundwater wells](https://www.iaea.org/node/230478); [Idaho National Laboratory for the US NRC: Loss of offsite power glossary (LOOP and station blackout definitions)](https://nrcoe.inl.gov/publicdocs/LOSP/loop-glossary.pdf); [Anadolu Agency (8 Nov 2026): Ukraine’s Zaporizhzhya nuclear plant loses all external power for 27th time, UN nuclear watchdog says](https://www.aa.com.tr/en/world/ukraines-zaporizhzhya-nuclear-plant-loses-all-external-power-for-27th-time-un-nuclear-watchdog/4115903)

## Chapter III · When the power goes

### 

That is the job of the emergency diesel generators: big engines that start by themselves when grid power disappears. Banks of batteries keep instruments, valves and control rooms running, and can carry them for a few hours if the engines fail. A VVER-1000 of this type is built with three independent safety systems, each with its own diesel, and any one of them alone can cool the reactor. Zaporizhzhia has twenty diesel generators across its six units. Press Cut off-site power, and watch them take over.

- batteries: instantly, direct current
- diesels: start by themselves, alternating current for the pumps
- mobile generators: brought in later

![Batteries supply direct current; operators switch off non-essential loads to make it last longer. AI-generated illustration.](https://assets.planetpast.com/a/10/10699c0a68143752.jpg)

![Identical pumps side by side: if one fails, another can do the same job. AI-generated illustration.](https://assets.planetpast.com/a/e7/e785d71bdfcd2b47.jpg)

- **3 × 100%**: three independent safety systems, each one alone is enough
- **20**: diesel generators at Zaporizhzhia in all (WNN)

Chapter III · When the power goes

#### Diesels, batteries and three trains

OECD-NEA (VVER-1000 comparison report): at Balakovo-4, a VVER-1000/V-320 like the Zaporizhzhia units, the emergency core cooling is built as three independent trains, each able to do the whole job (3×100%), backed by three emergency diesel generators. World Nuclear News (March 2025): Zaporizhzhia has 20 emergency diesel generators, and after Fukushima it installed mobile diesel generators as well. Idaho National Laboratory, for the NRC: when off-site power is lost the emergency generators must start and supply the safety buses.

NRC station blackout course: operators shed direct-current loads to extend battery life. Press Cut off-site power, Fail one train and Restore the grid in the scene. The 3D scenes are simplified teaching models, not to scale.

Sources: [OECD Nuclear Energy Agency, MDEP: VVER-1000 comparison report (Balakovo-4, V-320: three independent safety trains, three emergency diesel generators, 3×100%)](https://cms.oecd-nea.org/mdep/documents/TR06VVER-1000_comparison_report_FINAL.pdf); [World Nuclear News (28 Mar 2025): IAEA experts see tests of generators at Zaporizhzhia nuclear plant (20 emergency diesel generators; mobile generators added after Fukushima)](https://wnn.world-nuclear.org/articles/iaea-experts-see-tests-of-generators-at-zaporizhzhia-nuclear-plant); [Idaho National Laboratory for the US NRC: Loss of offsite power glossary (LOOP and station blackout definitions)](https://nrcoe.inl.gov/publicdocs/LOSP/loop-glossary.pdf); [US NRC technology course R-504B, lesson 4.5: Station blackout (10 CFR 50.63 rule of 1988; most plants cope for 4 hours; battery load shedding)](https://www.nrc.gov/docs/ML1414/ML14140A346.pdf)

### 

Behind the diesels sits an idea called defence in depth: several independent layers, from good design and early warnings to safety systems, so that if one fails, the next still holds. Last come a sealed containment building and an emergency plan for the people outside. Even the fuel sits inside barriers: a pellet in a metal tube, inside a thick steel vessel.

- 1 · prevention: design, construction, maintenance
- 2 · control unusual events in operation
- 3 · safety systems stop an accident progressing
- 4 · confine radioactive material in containment
- 5 · off-site emergency response

![Most of safety is unglamorous: inspecting, testing and repairing before anything goes wrong. AI-generated illustration.](https://assets.planetpast.com/a/2e/2ef1f2c23bf1ddda.jpg)

![Each barrier is meant to hold even if the one inside it fails. AI-generated illustration.](https://assets.planetpast.com/a/d0/d0049ebde2002078.jpg)

- uranium oxide pellet and its metal cladding
- the thick steel reactor coolant system
- the containment building

Chapter III · When the power goes

#### Defence in depth

Canadian Nuclear Safety Commission: defence in depth has five levels, from prevention in design, construction and maintenance, through control of unusual events and robust safety systems, to confinement in a containment structure and off-site emergency response; the levels are expected to be independent to the extent achievable. Nuclear-power.com: the barriers against release are the fuel and its cladding, the reactor coolant system boundary, and the containment building.

The 3D scenes are simplified teaching models, not to scale.

Sources: [Canadian Nuclear Safety Commission: Defence in depth (five levels)](https://www.cnsc-ccsn.gc.ca/eng/reactors/power-plants/defence-in-depth); [Nuclear-power.com: Multiple barriers to radionuclide release (fuel and cladding, reactor coolant boundary, containment)](https://www.nuclear-power.com/nuclear-power/reactor-physics/nuclear-safety/multiple-barriers-to-radionuclide-release)

### 

The case engineers fear most is losing the grid and the diesels together: a station blackout. Batteries still give direct current, enough for instruments, valves and the control room, but not for the big cooling pumps. In 1988 the US Nuclear Regulatory Commission ruled that every plant must ride out a blackout for a set time: for most plants, four hours, mostly on batteries. Four hours is enough if help arrives in time. At Fukushima in 2011, help did not come in time.

- **0 V AC**: no alternating current for the safety systems: grid and diesels both gone

![In a blackout, control rooms run on emergency lighting and battery-powered instruments. AI-generated illustration.](https://assets.planetpast.com/a/23/2342410946e9507a.jpg)

- 1988: NRC station blackout rule, 10 CFR 50.63
- 2012: order on mitigation strategies after Fukushima
- 2016: deadline to have the new plans in place

![Fukushima Daiichi had six reactors on the coast of Fukushima Prefecture. AI-generated illustration.](https://assets.planetpast.com/a/18/18591c914ee68537.jpg)

Chapter III · When the power goes

#### Station blackout

Idaho National Laboratory, for the NRC: a station blackout is the complete loss of AC power to the safety buses of a nuclear power plant unit, when off-site power is lost and the on-site emergency AC power also fails. NRC technology course on station blackout: the study NUREG-1032 (1988) led to the 10 CFR 50.63 rule, which requires each plant to withstand a blackout for a specified duration; most plants have a four-hour coping time (a few have eight), and procedures shed DC loads to make the batteries last.

Press Fail the diesels and Diesels running in the scene; the battery clock is schematic.

The 3D scenes are simplified teaching models, not to scale.

Sources: [Idaho National Laboratory for the US NRC: Loss of offsite power glossary (LOOP and station blackout definitions)](https://nrcoe.inl.gov/publicdocs/LOSP/loop-glossary.pdf); [US NRC technology course R-504B, lesson 4.5: Station blackout (10 CFR 50.63 rule of 1988; most plants cope for 4 hours; battery load shedding)](https://www.nrc.gov/docs/ML1414/ML14140A346.pdf); [US NRC Order EA-12-049 (Federal Register, 19 Mar 2012): Mitigation strategies for beyond-design-basis external events](https://www.govinfo.gov/content/pkg/FR-2012-03-19/html/2012-6547.htm)

## Chapter IV · Fukushima, 2011

### 

On the eleventh of March 2011, at 14:46, a magnitude 9.0 earthquake struck off northeastern Japan. At Fukushima Daiichi, the three running reactors shut down automatically. They were boiling water reactors, a different design with the same decay heat. The shaking brought down power lines, and the diesels started. About forty minutes later the tsunami arrived. Waves about fifteen metres high swept over the seawall onto a site about ten metres above the sea. The plant had been designed for a tsunami of about six metres. Twelve of its thirteen backup generators were knocked out by the flood, and the batteries of units one and two failed too.

- **M 9.0**: off the Sanriku coast, at 14:46
- **1 · 2 · 3**: units operating; unit 4 was down for maintenance, 5 and 6 in cold shutdown (WNA)

![Collapsed transmission towers cut Fukushima Daiichi off from the grid before the wave came. AI-generated illustration.](https://assets.planetpast.com/a/bc/bce26cd789cab5a1.jpg)

![Turbine halls at the plant were left under about five metres of seawater. AI-generated illustration.](https://assets.planetpast.com/a/b5/b54f8cd4e1f97e83.jpg)

- design tsunami, 2009: 6.1 m
- plant site: ~10 m
- tsunami at the plant: ~15 m

Chapter IV · Fukushima, 2011

#### The wave

Ministry of the Environment, Japan: a magnitude 9.0 earthquake struck at 14:46 on 11 March 2011; units 1–3 were operating and shut down automatically; off-site power was lost when transmission towers collapsed, and the emergency diesel generators started automatically before the tsunami flooded them. IAEA: the waves came over the protective wall about 40 minutes after the reactors shut down. World Nuclear Association: the waves reached about 15 m at the plant, which stood about 10 m above sea level; the design-basis tsunami had been raised to 5.7 m in 2002 and 6.1 m in 2009; the tsunami disabled 12 of 13 on-site backup generators, leaving one air-cooled generator serving units 5 and 6; the DC batteries of units 1 and 2 were flooded.

Press Send the wave in the scene. The cross-section is schematic; heights follow the WNA figures.

Sources: [Ministry of the Environment, Japan: Accident at TEPCO’s Fukushima Daiichi NPS (magnitude 9.0 at 14:46; injection lost for about 14 h at unit 1 and 6.5 h at units 2 and 3)](https://www.env.go.jp/en/chemi/rhm/basic-info/2022/pdf/basic-1st-06-01.pdf); [IAEA: Fukushima Daiichi, one year on (three operating units; waves over the protective wall about 40 minutes after shutdown)](https://www.iaea.org/node/3512); [World Nuclear Association: Fukushima Daiichi accident (15 m tsunami; 12 of 13 backup generators disabled; decay heat about 1.5% after one hour; explosion times; no radiation sickness)](https://world-nuclear.org/Information-Library/Safety-and-Security/Safety-of-plants/Fukushima-Daiichi-Accident)

### 

An hour after shutdown the three cores were still making about one and a half percent of their power: twenty-two to thirty-three megawatts each. With no pumps, the water boiled away. Unit one went about fourteen hours with no water pumped in, units two and three about six and a half. The fuel overheated and melted. Its zirconium tubes reacted with steam and made hydrogen, which leaked into the reactor buildings. Hydrogen explosions wrecked the buildings of units one and three. Unit four, shut down for maintenance, was wrecked too, by hydrogen believed to have come across from unit three. Nobody died of acute radiation sickness, but more than a hundred thousand people were evacuated.

- **22 MW**: unit 1
- **33 MW**: units 2 and 3, each

![Seawater was finally pumped in: unit 1 from 19:00 on 12 March, unit 3 with a fire pump on 13 March (WNA). AI-generated illustration.](https://assets.planetpast.com/a/9e/9e6502b138f8811b.jpg)

$$\text{Zr} + 2\,\text{H}_2\text{O} \rightarrow \text{ZrO}_2 + 2\,\text{H}_2$$
- $\text{H}_2$: hydrogen: about 800–1,000 kg in each of units 1–3 (estimate)

- 12 Mar, 15:36: unit 1
- 14 Mar, 11:00: unit 3
- 15 Mar, ~06:00: unit 4, from unit 3’s hydrogen

- **0**: cases of acute radiation syndrome
- **100,000+**: evacuated; about 27,000 still displaced in November 2025

Chapter IV · Fukushima, 2011

#### Meltdown

World Nuclear Association: about one hour after shutdown the cores were producing about 1.5% of their nominal thermal power, about 22 MW in unit 1 and 33 MW in units 2 and 3. Ministry of the Environment, Japan: coolant injection was suspended for about 14 hours at unit 1 and about 6.5 hours at units 2 and 3; the fuel overheated, the cores melted and damaged part of the pressure vessels, and radioactive material was released. Wikipedia: oxidation of zirconium cladding by steam produced roughly 800–1,000 kg of hydrogen in each of units 1–3.

WNA: explosions at unit 1 (15:36, 12 March), unit 3 (11:00, 14 March) and unit 4 (about 06:00, 15 March); the accident was rated level 7 on the international scale; no one suffered acute radiation syndrome; three TEPCO workers were killed by the earthquake and tsunami; over 100,000 people were evacuated, and WNA reports 2,313 disaster-related deaths among Fukushima evacuees, which it attributes to the stress of evacuation rather than radiation. Unit 1 got seawater from the evening of 12 March.

The 3D scenes are simplified teaching models, not to scale.

Sources: [World Nuclear Association: Fukushima Daiichi accident (15 m tsunami; 12 of 13 backup generators disabled; decay heat about 1.5% after one hour; explosion times; no radiation sickness)](https://world-nuclear.org/Information-Library/Safety-and-Security/Safety-of-plants/Fukushima-Daiichi-Accident); [Ministry of the Environment, Japan: Accident at TEPCO’s Fukushima Daiichi NPS (magnitude 9.0 at 14:46; injection lost for about 14 h at unit 1 and 6.5 h at units 2 and 3)](https://www.env.go.jp/en/chemi/rhm/basic-info/2022/pdf/basic-1st-06-01.pdf); [Wikipedia: Fukushima nuclear accident (zirconium cladding oxidised by steam made the hydrogen; unit 4 spent fuel pool)](https://ipfs.ssi.eecc.de/ipns/en.wikipedia-on-ipfs.org/wiki/Fukushima_Daiichi_nuclear_disaster); [IAEA: Fukushima Daiichi, one year on (three operating units; waves over the protective wall about 40 minutes after shutdown)](https://www.iaea.org/node/3512)

### 

Fukushima showed that one flood could take out every backup at once, at every unit on a site. In March 2012 the US regulator ordered three layers of backup: what is installed, portable gear kept on site, and help from outside. The plans, known as FLEX, had to cover the reactors and the spent fuel pools, at all units together, and be in place by the end of 2016. Plants around the world were stress-tested, and Zaporizhzhia itself added mobile diesel generators.

- initial: installed plant equipment
- transition: portable equipment kept on site
- final: off-site resources, indefinitely

![US plants keep extra generators, pumps and hoses on site, and two national response centres, in Phoenix and Memphis, hold more (NEI). AI-generated illustration.](https://assets.planetpast.com/a/b2/b2b3b7fa453e8dcb.jpg)

- **6**: mobile diesel generators installed, four connected to reactor units

Chapter IV · Fukushima, 2011

#### Lessons

NRC Order EA-12-049 (signed 12 March 2012, published 19 March 2012) requires a three-phase approach to beyond-design-basis external events: installed equipment first, then portable equipment and consumables on site, then off-site resources to sustain core cooling, containment and spent fuel pool cooling indefinitely; the strategies must handle a simultaneous loss of all AC power at all units on a site, with implementation due by 31 December 2016 at the latest. NEI: the industry’s “FLEX” approach added multiple sets of portable equipment at each plant, and two national response centres in Phoenix and Memphis.

IAEA (Fukushima, one year on): stress tests of plants worldwide and the IAEA Action Plan on Nuclear Safety. WNA: Japan ordered EU-style stress tests and created a new regulator. WNN (March 2025): six mobile diesel generators were installed at Zaporizhzhia after Fukushima, four connected to reactor units and two outside the site. The 3D scenes are simplified teaching models, not to scale.

Sources: [US NRC Order EA-12-049 (Federal Register, 19 Mar 2012): Mitigation strategies for beyond-design-basis external events](https://www.govinfo.gov/content/pkg/FR-2012-03-19/html/2012-6547.htm); [Nuclear Energy Institute: Upgrades to backup safety systems part of Fukushima response (FLEX portable equipment; two national response centres)](https://www.nei.org/resources/fact-sheets/upgrades-backup-safety-systems-fukushima-response); [IAEA: Fukushima Daiichi, one year on (three operating units; waves over the protective wall about 40 minutes after shutdown)](https://www.iaea.org/node/3512); [World Nuclear Association: Fukushima Daiichi accident (15 m tsunami; 12 of 13 backup generators disabled; decay heat about 1.5% after one hour; explosion times; no radiation sickness)](https://world-nuclear.org/Information-Library/Safety-and-Security/Safety-of-plants/Fukushima-Daiichi-Accident); [World Nuclear News (28 Mar 2025): IAEA experts see tests of generators at Zaporizhzhia nuclear plant (20 emergency diesel generators; mobile generators added after Fukushima)](https://wnn.world-nuclear.org/articles/iaea-experts-see-tests-of-generators-at-zaporizhzhia-nuclear-plant)

## Chapter V · The other fuel

### 

Every plant has a second store of hot fuel: the spent fuel pool, where used fuel sits under about six metres of water that cools it and shields people from its radiation. The pool needs pumps too. At Fukushima, the pool of unit four, which held all of that unit's fuel, warmed to eighty-four degrees. After some years, fuel can move to dry casks: steel and concrete cylinders cooled by air that flows in at the bottom and out at the top, with no fans or pumps.

![The pool walls are thick reinforced concrete with a stainless-steel lining (NRC). AI-generated illustration.](https://assets.planetpast.com/a/73/73659db97e508ec4.jpg)

- **84 °C**: reached after the 15 March explosion; an inspection on 30 April found no significant damage to the fuel

![Each cask holds older fuel whose decay heat has fallen enough for air alone to carry it away. AI-generated illustration.](https://assets.planetpast.com/a/0a/0a8fc5db9baf7695.jpg)

Chapter V · The other fuel

#### Spent fuel pools and casks

US NRC (storage of spent fuel): every so often about a third of the fuel in a reactor is replaced; pools have about 20 feet (about 6 m) of water above the top of the fuel, which cools it and shields radiation, inside thick steel-reinforced concrete walls with stainless-steel liners; dry casks draw fresh air in at the bottom without fans or pumps and let heated air rise out through vents at the top. Wikipedia (Fukushima): all of unit 4’s fuel was in its pool; after the 15 March explosion and fire the pool reached 84 °C, and an inspection on 30 April found no significant damage to the rods.

Westinghouse gives one design’s timeline: in an AP1000 blackout, pumped pool cooling stops and the water starts to boil after about 3 hours, then is topped up by gravity. Press Stop pool cooling and Run pool cooling in the scene; the warming shown is illustrative. The 3D scenes are simplified teaching models, not to scale.

Sources: [US NRC: Backgrounder on storage of spent nuclear fuel (pools with about 20 feet of water above the fuel; dry casks cooled by air)](https://www.nrc.gov/regulations-legislation/fact-sheets-brochures/backgrounder-on-storage-of-spent-nuclear-fuel); [Wikipedia: Fukushima nuclear accident (zirconium cladding oxidised by steam made the hydrogen; unit 4 spent fuel pool)](https://ipfs.ssi.eecc.de/ipns/en.wikipedia-on-ipfs.org/wiki/Fukushima_Daiichi_nuclear_disaster); [Wikipedia: Decay heat (6.5% at shutdown, 1.5% after an hour, 0.4% after a day, 0.2% after a week; spent fuel about 10 kW per tonne after a year)](https://ipfs.ssi.eecc.de/ipns/en.wikipedia-on-ipfs.org/wiki/Decay_heat); [Westinghouse: AP1000 station blackout (passive heat exchanger, IRWST, PCCWST, spent fuel pool timeline)](https://westinghousenuclear.com/media/3pipeoof/ap1000-station-blackout.pdf)

## Chapter VI · Cooling without power

### 

Newer designs try to need no power at all for the first days. One is Westinghouse's AP1000. If power is lost, water circulates by itself: hot water rises from the core and cooled water sinks back through a tank inside the containment. When that tank boils, the steam condenses on the steel wall, cooled by water running down from a tank on the roof and by rising air. Westinghouse says this works for seventy-two hours with no electricity and no operator action. After that, people must top up the water.

![The water tank sits on top of the shield building, so gravity alone can empty it. AI-generated illustration.](https://assets.planetpast.com/a/43/4330c18196e420da.jpg)

- active: pumps, valves and diesels
- passive: gravity, natural circulation, condensation, air
- the tank inside starts to boil after about 5 hours

![Water spreads over the outside of the steel vessel and evaporates; air drawn in near the top rises past it and out. AI-generated illustration.](https://assets.planetpast.com/a/cb/cb0d0700c39d4115.jpg)

- **72 h**: with no AC power and no operator action
- **after**: operators transfer water and start small ancillary diesels

Chapter VI · Cooling without power

#### Passive safety

Westinghouse (AP1000 station blackout): a passive heat exchanger moves decay heat into the in-containment refuelling water storage tank, driven by the density difference between hot and cooler water, with no pumps; after about 5 hours that water boils and the steam condenses on the steel containment vessel and drains back. Water from the passive containment cooling tank on the roof of the shield building drains by gravity over the vessel, and natural air flow through the shield building carries the heat away. Westinghouse says the plant needs no human intervention for up to 72 hours; after that, operators transfer water and start ancillary diesel generators. The NRC’s 2012 order notes that Vogtle units 3 and 4, AP1000s, already provide 72 hours of cooling without AC power.

Press Active and Passive in the scene to switch between the two ways of cooling. The 3D scenes are simplified teaching models, not to scale.

Sources: [Westinghouse: AP1000 station blackout (passive heat exchanger, IRWST, PCCWST, spent fuel pool timeline)](https://westinghousenuclear.com/media/3pipeoof/ap1000-station-blackout.pdf); [Westinghouse: AP1000 plant passive safety systems and timeline for station blackout](https://westinghousenuclear.com/data-sheet-library/ap1000-plant-passive-safety-systems-and-timeline-for-station-blackout/); [US NRC Order EA-12-049 (Federal Register, 19 Mar 2012): Mitigation strategies for beyond-design-basis external events](https://www.govinfo.gov/content/pkg/FR-2012-03-19/html/2012-6547.htm)

## Epilogue

### 

At Zaporizhzhia, years after shutdown, the decay heat is far smaller, but the IAEA says cores and pools still need cooling water. Its diesel fuel would last a limited number of generators about two weeks. The IAEA's head, Rafael Grossi, spoke of a continued precarious nuclear safety situation. The IAEA said the cause of the disconnection was not yet known. Ukraine's foreign minister accused Russia, which has held the plant since 2022, of using nuclear safety as blackmail; Russia had not responded. One line and two weeks of diesel on one side; seventy-two hours of cooling by gravity and air on the other. How much time should a reactor be able to buy on its own?

![The two things a shut-down plant still needs from outside: water to take its heat, and power to run its pumps. AI-generated illustration.](https://assets.planetpast.com/a/38/38d6604edb6a2f19.jpg)

> “It is the 27th such event during the conflict, underlining the continued precarious nuclear safety situation.” (Rafael Grossi, IAEA Director General, 8 November 2026)

- **1 line**: Zaporizhzhia’s only off-site link (IAEA)
- **~2 weeks**: diesel for a limited number of generators (AA)
- **72 h**: AP1000 passive cooling, no power, no operators (Westinghouse)

![Mobile generators, added at many plants after Fukushima, are one more way to run a pump. AI-generated illustration.](https://assets.planetpast.com/a/a4/a408e981653d3561.jpg)

Epilogue · Sources

#### Sources

Every fact in this film comes from the sources below. Anadolu Agency (8 November 2026): fuel reserves are enough for a limited number of generators for about two weeks; Grossi called for the grid connection to be restored and diesel reserves increased; Ukraine’s foreign minister Andrii Sybiha called Russia’s handling of nuclear safety “another instrument of blackmail” and said the plant should return to Ukrainian control; Russia had not responded at the time of publication. IAEA Update 310: the six reactors, in cold shutdown since 2024, still need cooling water for their cores and spent fuel pools. The chapter stills and pictures are AI-generated illustrations, not photographs of the real plants; the 3D scenes are simplified teaching models, not to scale.

Sources: [Anadolu Agency (8 Nov 2026): Ukraine’s Zaporizhzhya nuclear plant loses all external power for 27th time, UN nuclear watchdog says](https://www.aa.com.tr/en/world/ukraines-zaporizhzhya-nuclear-plant-loses-all-external-power-for-27th-time-un-nuclear-watchdog/4115903); [The Kyiv Independent (8 Nov 2026): Power to Zaporizhzhia nuclear power plant cut, restored, IAEA says](https://kyivindependent.com/power-to-zaporizhzhia-nuclear-power-plant-cut-restored-iaea-says/); [American Nuclear Society, Nuclear Newswire (9 Sep 2026): Zaporizhzhia restores off-site power following IAEA-brokered local ceasefire (26th loss, 20 August 2026)](https://www.ans.org/news/2026-09-09/article-8377/zaporizhzhia-restores-offsite-power-following-iaeabrokered-local-ceasefire/); [IAEA, Update 298: Director General statement on the situation in Ukraine (June 2025): ten off-site lines before the conflict; six units in cold shutdown since 2024](https://www.iaea.org/node/222642); [IAEA, Update 310: Director General statement on the situation in Ukraine (2025): cores and spent fuel pools still need cooling water; groundwater wells](https://www.iaea.org/node/230478); [IAEA, Update 263: Director General statement on the situation in Ukraine (Dec 2024): six units in cold shutdown, no electricity produced for more than two years](https://www.iaea.org/node/195686); [Ukrinform (13 Apr 2024): All reactors at Zaporizhzhia NPP in cold shutdown for first time since 2022, IAEA says](https://www.ukrinform.net/rubric-economy/3852084-all-reactors-at-zaporizhzhia-npp-in-cold-shutdown-for-first-time-since-2022-iaea.html); [World Nuclear News (28 Mar 2025): IAEA experts see tests of generators at Zaporizhzhia nuclear plant (20 emergency diesel generators; mobile generators added after Fukushima)](https://wnn.world-nuclear.org/articles/iaea-experts-see-tests-of-generators-at-zaporizhzhia-nuclear-plant); [US DOE Fundamentals Handbook, Heat Transfer (HT-02): Decay heat, about 7% of pre-shutdown power, about 2% within the first hour, 1% within the first day](https://nuclearpowertraining.tpub.com/h1012v2/css/Decay-Heat-74.htm); [Wikipedia: Decay heat (6.5% at shutdown, 1.5% after an hour, 0.4% after a day, 0.2% after a week; spent fuel about 10 kW per tonne after a year)](https://ipfs.ssi.eecc.de/ipns/en.wikipedia-on-ipfs.org/wiki/Decay_heat); [US NRC glossary: Cold shutdown (reactor coolant at atmospheric pressure and below 200 °F)](https://www.nrc.gov/reading-rm/basic-ref/glossary/cold-shutdown.html); [Wikipedia: Shutdown (nuclear reactor) (hot and cold shutdown; below 93 °C)](https://en.wikipedia.org/wiki/Shutdown_(nuclear_reactor)); [Wikipedia: VVER (VVER-1000/V-320: 3,000 MW thermal, 1,000 MW electric, four loops; Zaporizhzhia units 1–6)](https://en.wikipedia.org/wiki/VVER); [OECD Nuclear Energy Agency, MDEP: VVER-1000 comparison report (Balakovo-4, V-320: three independent safety trains, three emergency diesel generators, 3×100%)](https://cms.oecd-nea.org/mdep/documents/TR06VVER-1000_comparison_report_FINAL.pdf); [Idaho National Laboratory for the US NRC: Loss of offsite power glossary (LOOP and station blackout definitions)](https://nrcoe.inl.gov/publicdocs/LOSP/loop-glossary.pdf); [US NRC technology course R-504B, lesson 4.5: Station blackout (10 CFR 50.63 rule of 1988; most plants cope for 4 hours; battery load shedding)](https://www.nrc.gov/docs/ML1414/ML14140A346.pdf); [Canadian Nuclear Safety Commission: Defence in depth (five levels)](https://www.cnsc-ccsn.gc.ca/eng/reactors/power-plants/defence-in-depth); [Nuclear-power.com: Multiple barriers to radionuclide release (fuel and cladding, reactor coolant boundary, containment)](https://www.nuclear-power.com/nuclear-power/reactor-physics/nuclear-safety/multiple-barriers-to-radionuclide-release); [World Nuclear Association: Fukushima Daiichi accident (15 m tsunami; 12 of 13 backup generators disabled; decay heat about 1.5% after one hour; explosion times; no radiation sickness)](https://world-nuclear.org/Information-Library/Safety-and-Security/Safety-of-plants/Fukushima-Daiichi-Accident); [IAEA: Fukushima Daiichi, one year on (three operating units; waves over the protective wall about 40 minutes after shutdown)](https://www.iaea.org/node/3512); [Ministry of the Environment, Japan: Accident at TEPCO’s Fukushima Daiichi NPS (magnitude 9.0 at 14:46; injection lost for about 14 h at unit 1 and 6.5 h at units 2 and 3)](https://www.env.go.jp/en/chemi/rhm/basic-info/2022/pdf/basic-1st-06-01.pdf); [Wikipedia: Fukushima nuclear accident (zirconium cladding oxidised by steam made the hydrogen; unit 4 spent fuel pool)](https://ipfs.ssi.eecc.de/ipns/en.wikipedia-on-ipfs.org/wiki/Fukushima_Daiichi_nuclear_disaster); [US NRC Order EA-12-049 (Federal Register, 19 Mar 2012): Mitigation strategies for beyond-design-basis external events](https://www.govinfo.gov/content/pkg/FR-2012-03-19/html/2012-6547.htm); [Nuclear Energy Institute: Upgrades to backup safety systems part of Fukushima response (FLEX portable equipment; two national response centres)](https://www.nei.org/resources/fact-sheets/upgrades-backup-safety-systems-fukushima-response); [US NRC: Backgrounder on storage of spent nuclear fuel (pools with about 20 feet of water above the fuel; dry casks cooled by air)](https://www.nrc.gov/regulations-legislation/fact-sheets-brochures/backgrounder-on-storage-of-spent-nuclear-fuel); [Westinghouse: AP1000 plant passive safety systems and timeline for station blackout](https://westinghousenuclear.com/data-sheet-library/ap1000-plant-passive-safety-systems-and-timeline-for-station-blackout/); [Westinghouse: AP1000 station blackout (passive heat exchanger, IRWST, PCCWST, spent fuel pool timeline)](https://westinghousenuclear.com/media/3pipeoof/ap1000-station-blackout.pdf)